Planning In-House and Subcontracted Production with Gantt Charts
Learn how Gantt-based capacity planning helps apparel manufacturers balance in-house and subcontracted production, track subcontractors and update schedules using shop-floor data.
Most apparel manufacturers use part of their production capacity on their own sewing lines and outsource the remaining work to subcontractors. This hybrid model provides flexibility but makes planning more challenging. A Gantt chart is an effective tool for displaying which job will be performed on which production line or by which subcontractor, and during what period.
Key Elements of Gantt Planning
- Resources: In-house production lines, cutting tables and subcontractors
- Jobs: Production stages defined by order or work order
- Durations: Calculated using quantities, standard minutes and resource efficiency
- Dependencies: Sewing cannot start before cutting is completed, and packing cannot start before sewing is finished
- Constraints: Material availability dates and customer delivery deadlines
In-House Production or Subcontracting?
The decision depends on production line capacity, product complexity, quality risks and cost. When the workload of in-house lines is visible on the Gantt chart, it becomes easier to determine which orders should be outsourced. Comparing subcontracting costs with theoretical costs also clarifies the financial impact of the decision.
Subcontractor Tracking
Cut components and accessories sent to subcontractors, as well as completed products returned from them, should be tracked by quantity. Knowing a subcontractor’s workload and historical delivery performance makes it possible to agree on realistic delivery dates when assigning new work. Linking subcontractor quality inspection results to the relevant order also makes supplier evaluation more objective.
Updating the Plan with Shop-Floor Data
A production plan can only be managed effectively when it is compared with actual production. Quantity and efficiency data collected from in-house lines by a garment production efficiency tracking system shows the actual progress of jobs on the Gantt chart. Delayed jobs can be identified before their delivery dates are missed, allowing rescheduling, overtime or subcontracting decisions to be made in time.
Connection with Marker and Cutting Planning
The sewing schedule depends on cutting being completed on time. Planning cutting tables by marker and viewing this schedule together with the Gantt plan reveals whether the bottleneck is in cutting or sewing.
Gantt-based in-house and subcontracted production planning brings orders, materials and capacity together in an Apparel ERP system. It is one of the most reliable ways to keep delivery commitments.